  • Carried out investigations into sludge operations and recommended options to optimise the sludge drying bed facilities at the Mittagong STP, Wingecarribee Shire Council, NSW.
  • Carried out the design of groundwater, drainage, water and sewerage treatment services for the Rohtung Tunnel Project, India.
  • Design verification of Civil, Hydraulic, Process, Mechanical and Electrical Conceptual Design and conducted Value Engineering Workshops for the Port Moresby, PNG Sewerage Scheme comprising of a 18.4 ML/day Sewage Treatment Plant, 17 Pump Stations, 35 km’s of Rising mains and Sewers (100 mm. to 600 mm. diameter), 2 km Ocean Outfall and 16 Sludge Drying Beds$120 m.
  • Detailed design and project management of Solar Powered Wastewater Aerated Lagoon and Constructed Wetlands 0.2 ML/day for Warrumbui Conference Centre, Murrumbatem NSW. Concept and Detailed Design and preparation of civil, mechanical and electrical specifications for the Wastewater Treatment Plant 0.5 ML/day at the Aurukun mining site, Queensland.
  • Part of a team involved with the verification of Drawings for the 66 Ml/day Luggage Point Recycled Wastewater Treatment Plant. Queensland. The treatment process consisted of flow equalization, pre-treatment (coagulation), clarification for phosphate and turbidity removal, micro-filtration, reverse osmosis, advanced oxidation (hydrogen peroxide and UV dosing). $350m, Queensland.
  • Design development, decision making, effective construction, operations & maintenance, providing inputs, technical evaluation of process equipment associated with a Sequential Batch Reactor Wastewater Treatment Plant 0.5 ML/day, Rosedale, Victoria
  • Redesigned, project management and construction of the Augmentation of the Narrandera Sewage Treatment Plant 3 ML/day NSW.
  • Detailed Design, project management and construction of the upgrade of the Griffith 12ML/day and Yenda 1 ML/day Wastewater Treatment Plants, NSW
  • Project Management of the installation Magnesium Hydroxide Odour Control Systems in the Sewerage Transport Systems, Griffith NSW.
  • Design, Project Management, Environmental Evaluation, Construction, Commissioning, and Operations of the 3 ML/day Anglesea Tertiary Standard BNR Wastewater Treatment Plant. The project consisting of the following six contracts:
    • Civil Works – Treatment
    • Plant, Pump Station and Rising Main.
    • Ocean Outfall
    • Sludge Belt Filter Press
    • Ultra – Violet Disinfection & Wastewater re-use system
  • Conducted meetings, and provided information for discussions with Anglesea Wastewater Action Groups, and the Public regarding Ocean Outfall, Victoria.
  • Investigations into the Barwon Downs Dairy Wastewater Treatment Anaerobic and Aerobic Lagoon System, Victoria.
  • Investigations into the composting of biosolids at the Black Rock Wastewater Treatment Plant.60 ML/day, Victoria.
  • Conceptual Design of the recycled wastewater effluent re-use scheme at Winchelsea Sewage Treatment Plant 0.5 ML/day. Works consisted of Lagoons, Rising Mains, and Pump Stations, Victoria.
  • Conceptual and Detailed Design of 15 Activated Sludge Wastewater Package and Regional Activated Sludge Treatment Plants. Treatment capacity up to 10 Ml/day. Cost of works estimated $300 m, Victoria.
  • Conceptual and Detailed Design of Brushy Creek Wastewater Treatment Plant 10 ML/day, Victoria.
  • Detailed Design of the upgrade of the Menangle MBR WTP.
  • Detailed Design of sludge dewatering facilities for Malabar, Penrith and Cronulla WTP’s, Sydney Water, NSW.
  • Detailed Design and selection of plant and equipment for $55m upgrade of the Biological and Chemical Odour Control Facility, Woodman Point WTP, WA.
  • Detailed Design and procurement of equipment of a Dissolved Air Flotation Unit, Sydney Water, NSW.
  • Conceptual and Detailed Design of Majura package Wastewater Treatment Plant, Canberra.
  • Managed the detailed design of seven WTP’s for Australian Water Technologies, Sydney, NSW.
  • Designed and procure a vacuum pump priming system and clean water pumping facility for Orchard Hills WTP.
  • Detailed Design of Mudgee Water Filtration Plant Upgrade, (18 MLD throughput) May 2019 to Feb 2020, Mid-Western Regional Council,
  • Concept Design Of Drouin Sewage Treatment Mbr Plant (4 stage Bardenpho BNR process), Gippsland Water at Vic, April 2018,
  • Technical Services for Groundwater Treatment Plant – Metro Tunnel Early Works for Rail Projects, Victoria, John Holland Groups, June 2017 to march 2018,
  • Water Recycling FEED package and Solids Handling of the AGL Gloucester Gas Project, AGL 2015-2016,
  • Preliminary and Concept Design of Carrington Coal Mine Wastewater Treatment Plant Upgrade and Integration, Hunter Port Waratah Coal Services (throughput of 0.5 ML/d), 2015
  • APLNG Talinga Water Treatment Facility (WTF) Expansion Detailed Design, Origin Energy Construction Alliance (RO throughput of 20 ML/d), Origin Energy, mid 2013 – 2014,
  • Detailed Design & Construction Support of APLNG Upstream Condabri Central WTF (40 ML/d), Origin Energy Construction Alliance, 2012 – 2014,
  • APLNG Upstream Phase 1 Water Treatment Facility (WTF) FEED Design, (RO throughput of 40 and 60 ML/d for Condabri Central and Reedy Creek, respectively), Origin Energy and EnerStream JV, QLD, 2010 – March 2011.
  • Detailed Design and Commissioning of Yamba Intermittently Decanted Extended Aeration (IDEA) STP (17000 EP), Clarence Valley Council and DOC, 2007-2010,
  • Detailed Design of Victorian Seawater Desalination Plant for Thiess Degremont JV, (RO throughput of 450 ML/d), VIC, 2009 to Dec 2009,
  • Preliminary Concept Design and Costing of A Sewer Mining MBR for City of Canada Bay, Jan 2009,
  • Concept Design and Construction Support of Reclaimed Sewerage Effluent Reuse of Reclaimed Water Plant and Commissioning Support at Vales Point Power Station (RO throughput of 3 ML/d), Delta Electricity, 2006-2008,
  • Detailed design of Maclean Intermittently Decanted Extended Aeration (IDEA) STP (28000 EP) at Clarence Valley Council, 2005 -2007,